Facebook Twitter MySpace YouTube



Forum Search   Advanced Search
May 23, 2013, 06:14:08 PM
Welcome, Guest.
Please login above or register.
News: OIAM!
   
Pages: [1]
   
Author Topic: "time to shine" ledges  (Read 2504 times)
0 Members and 1 Guest are viewing this topic.
peacepappies
SLAP Pal
******
Rep: 0
Posts: 1716
grip it and rip it


Ignore
« on: June 12, 2008, 10:50:31 AM »

a friend and I found a place lately and it's seriously perfect for building some ledges. the problem is we dont really know how to build them. can someone please explain in a few steps how to ? the kind of ledges im thinking about are the ones they skate in time to shine a bit, where timtim does the switch shovit nosegrind fakie flip, and antwuan bluntslides in the deathwish promo, you know the ones.

figured some other people wanted to know as well.
Logged

the ber' is stoked!
rocklobster
SLAP Pal
******
Rep: 249
Posts: 2930
still rocklobster


Ignore
« Reply #1 on: June 12, 2008, 11:22:22 AM »

http://www.slapmagazine.com/index.php?option=com_smf&Itemid=33&topic=19760.0

this thread pretty much covered it....
Logged
peacepappies
SLAP Pal
******
Rep: 0
Posts: 1716
grip it and rip it


Ignore
« Reply #2 on: June 12, 2008, 01:04:39 PM »

yea i know there was something like that floating around, gnar'd
Logged

the ber' is stoked!
rocklobster
SLAP Pal
******
Rep: 249
Posts: 2930
still rocklobster


Ignore
« Reply #3 on: June 12, 2008, 06:28:57 PM »

there was another thread on making concrete ledges a while back too....

http://www.slapmagazine.com/index.php?option=com_smf&Itemid=33&topic=24297.0

i cant find the concrete ledge thread but this is pretty helpful too....

edit: here is it....

http://www.slapmagazine.com/index.php?option=com_smf&Itemid=33&topic=19760.0
Logged
Pages: [1]
   
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.11 | SMF © 2006-2009, Simple Machines LLC Valid XHTML 1.0! Valid CSS!